Friday, November 26, 2010

49' Euro update

With a massive 1.5 meters added between the settees and the stern gates we have some serious area to play with. An aft heads and shower unit is located fwd to starboard and to even up the seating area we have slid the port table and settee aft 650mm allowing for a great galley serving area and washer/dryer with vertical dive tank storage behind. The first 49’ Euro to be launched features a dive compressor, water maker, 9.5 KVA Onan genset, Air conditioning and hi gloss cherry cabinetry.

We are also designing a pop up BBQ so we can lift and lower from below decks at the touch of a button.

As both 49’ Euro’s are powered by twin 345 MTU’s I can’t wait to trial and compare the performance.


Monday, November 1, 2010

Our latest challenge

Our latest challenge is tooling up for the two 49’ Euro’s currently under construction.
With proposed launch dates in March 2011 and many new moulds to be built, we can only now give you the first glimpses of the real deal.
You can make your mind up for yourself as we have pushed her out into the light of day and taken many shots from many angles.